Aug 23, 2019 | Engineering
The Michigan Department of Transportation has released a new Power Unit Only Construction Equipment annual permit. This new permit type will allow those who own multiple pieces of construction equipment, along with the trucks and trailers, to now purchase a single...
Aug 7, 2019 | Engineering
The Michigan Department of Transportation (MDOT), Southwest Region, is requesting Statements of Qualifications (“SOQs”) from entities (“Submitters”) interested in submitting proposals for the design and construction of a new US-31 connection to I-94, reconstruction of...
Jun 19, 2019 | Engineering
The Michigan Department of Transportation (MDOT), Bay Region and Metro Region, are requesting Statements of Qualifications (“SOQs”) from entities (“Submitters”) interested in submitting proposals for designing, installing, and integrating into the existing ITS system...
May 17, 2019 | Engineering
At MITA’s request, and with FHWA approval, MDOT has agreed to extend the implementation date of the “DBE at Time of Bid” process revision from the July 12, 2019 bid letting to the October 4, 2019 bid letting. Please see MITA’s April 12, 2019, MDOT to Implement a...
May 9, 2019 | Engineering
Effective Monday, May 13, 2019 at 6:00 am, weight restrictions will be lifted on all state trunkline highways within the entire State of Michigan.State trunkline highways typically carry M, I, or US designations. Weight restriction information and updates may be...
May 3, 2019 | Engineering
3M Fall Protection has learned of the possibility of a manufacturing defect in a dorsal d-ring of ExoFit NEX™ harnesses manufactured between January 2016 and December 2018. Although there have been no reported incidents involving this condition, a dorsal d-ring...