Feature image not available
Engineering

Reminder – Work Zone Traffic Control Equipment Must Meet NCHRP 350

The prime contractor is responsible for ensuring that all work zone traffic control equipment is NCHRP 350 compliant per section 922.01 of the 2003 Standard Specifications for Construction and the contract documents. Temporary sign panels, supports, cones, drums, and Type III barricades must meet the NCHRP 350 crashworthy requirements. MDOT